About the project

As Tek Enerji, we provide the energy used by BURULAŞ 30 light rail stations with solar power plants installed on the roofs of 30 stations. This project is the first and only build-operate-transfer model in Turkey. Total installed solar power of 30 stations: 2289 kWp. The construction period of the work is 1 year and the operation period is 10 years. At the end of 10 years, the power plant will be transferred to Burulaş

Project Information

Customer: BURULAŞ

Location: Bursa

Year: 2020

Capacity: 30 Metro Station

Build time: 1 Year

Operation Duration: 10 Year

Industry: Transport